Home > FAQ > HERO-TECH chillers' operation >

what is the processing time for HERO-TECH chiller?

what is the processing time for HERO-TECH chiller?
Update Time:2017-07-27

Q: what is the processing time for HERO-TECH chiller?


A: 

For standard HERO-TECH water chillers, please see following details,


1. Air cooled industrial chiller with scroll compressor, 3ph 380v/50hz, R22/R407C;


Air cooled industrial chiller 1/2hp to 10hp, production finished within 7 days;

Air cooled industrial chiller 15hp to 25hp, production finished within 20 days;

Air cooled industrial chiller 30hp to 50hp, production finished within 25 days;



2. Water cooled industrial chiller with scroll compressor, 3ph 380v/50hz, R22/R407C;

Water cooled industrial chiller 3hp to 12hp, production finished within 10 days;

Water cooled industrial chiller 15hp to 25hp, production finished within 20 days;

Water cooled industrial chiller 30hp to 60hp, production finished within 25 days;



3. Air cooled screw chiller with semi-hermetic screw compressor, 3ph 380v/50hz, R22/R407C;


Air cooled screw chiller 40hp to 120 hp, production finished within 25 days;

Air cooled screw chiller 150hp to 300 hp, production finished within 35 days;



4. Water cooled screw chiller with semi-hermetic screw compressor, 3ph 380v/50hz, R22/R407C;


Water cooled screw chiller 40TON to 280 TON, production finished within 25 days;

Water cooled screw chiller 300TON to 540TON, production finished within 30 days;

Water cooled screw chiller 550TON to 1000TON, production finished within 35 days;


Air-cooled screw chiller

Water-cooled screw chiller

Air-cooled scroll chiller

Water-cooled scroll chiller

Air-cooled glycol chiller

Water-cooled glycol chiller

A/C (Air-cooled) screw type glycol chiller

W/C (Water-cooled) screw type glycol chiller

Heating and cooling machine

Oil cooling chiller

Mold temperature controller

Cooling tower

Customized chillers

  Lydia